A meeting to discuss and plan the next actions of Extinction Rebellion in Iceland and reflect on the previous one.
Accessibility:
“We will make sure to have people there ready to help anybody get where they need to go if they need help.”
There is a step before the garden gate and then 5 steps leading to the main entrance, each 17 cm high, door widths in the building vary between 50 cm (upstairs washroom door) and 80 cm (entrance door).
The bathrooms are so far only on the upper floor and in the basement. The door to the meeting room is 75 cm wide (as most other doors in the building). There is no bathroom on the ground floor.
Both washrooms in the building are gender neutral. The event takes place upstairs.
An independent event organised by Extinction Rebellion Iceland.
Climate Crises Talk – Aviation, transport and whats needed to stay under 1.5°C of warming? // Loftslagskrísuspjall – Flugumferð, samgöngur og hvað þarf til að halda jörðinni undir 1,5°C hlýnun?
Michal Czepkiewicz and Áróra Árnadóttir will give a talk based on their studies into greenhouse gas emissions and climate change – particularly how it relates to aviation and other means of transport.
Accessibility:
“We’ll make sure there will be someone there ready to help anybody who might need help getting around the house or anything else.”
There is a step before the garden gate and then 5 steps leading to the main entrance, each 17 cm high, door widths in the building vary between 50 cm (upstairs washroom door) and 80 cm (entrance door).
The bathrooms are so far only on the upper floor and in the basement. The door to the meeting room is 75 cm wide (as most other doors in the building). There is no bathroom on the ground floor.
Both washrooms in the building are gender neutral.
General Assembly of the Industrial Workers of the World (IWW) Ísland.
Allsherjarfundur Heimssamband Verkafólks á Íslandi
Accessibility:
There is a step before the garden gate and then 5 steps leading to the main entrance, each 17 cm high, door widths in the building vary between 50 cm (upstairs washroom door) and 80 cm (entrance door).
The bathrooms are so far only on the upper floor and in the basement. The door to the meeting room is 75 cm wide (as most other doors in the building). There is no bathroom on the ground floor.
Both washrooms in the building are gender neutral.
“We will make sure to have people there ready to help anybody get where they need to go if they need help.”
There is a step before the garden gate and then 5 steps leading to the main entrance, each 17 cm high, door widths in the building vary between 50 cm (upstairs washroom door) and 80 cm (entrance door).
The bathrooms are so far only on the upper floor and in the basement. The door to the meeting room is 75 cm wide (as most other doors in the building). There is no bathroom on the ground floor.
Both washrooms in the building are gender neutral. The event takes place upstairs.
“We will make sure to have people there ready to help anybody get where they need to go if they need help.”
There is a step before the garden gate and then 5 steps leading to the main entrance, each 17 cm high, door widths in the building vary between 50 cm (upstairs washroom door) and 80 cm (entrance door).
The bathrooms are so far only on the upper floor and in the basement. The door to the meeting room is 75 cm wide (as most other doors in the building). There is no bathroom on the ground floor.
Both washrooms in the building are gender neutral. The event takes place upstairs.
“We will make sure to have people there ready to help anybody get where they need to go if they need help.”
There is a step before the garden gate and then 5 steps leading to the main entrance, each 17 cm high, door widths in the building vary between 50 cm (upstairs washroom door) and 80 cm (entrance door).
The bathrooms are so far only on the upper floor and in the basement. The door to the meeting room is 75 cm wide (as most other doors in the building). There is no bathroom on the ground floor.
Both washrooms in the building are gender neutral. The event takes place upstairs.
everyone who is interested in helping with hátíðni is welcome to come to the meeting
Accessibility:
Andrými is unfortunately so far not wheelchair-accessible. There is a step before the garden gate and then 5 steps leading to the main entrance, each 17 cm high, door widths in the building vary between 50 cm (upstairs washroom door) and 80 cm (entrance door).
The bathrooms are so far only on the upper floor and in the basement. The door to the meeting room is 75 cm wide (as most other doors in the building). The meeting takes place upstairs.
Both washrooms in the building are gender neutral.
Meeting of the housing group or anyone interested in joining the accessibility project.
Important tasks for the month are organising fundraising for the rent and taking the next steps in improving accessibility; starting with a ramp, a rented moveable toilet, checking the specific grants and making a reconstruction plan.
Current accessibility:
There is a step before the garden gate and then 5 steps leading to the main entrance, each 17 cm high, door widths in the building vary between 50 cm (upstairs washroom door) and 80 cm (entrance door).
The bathrooms are so far only on the upper floor and in the basement. The door to the meeting room is 75 cm wide (as most other doors in the building). There is no bathroom on the ground floor.
Both washrooms in the building are gender neutral.
Meeting of the housing group or anyone interested in joining the accessibility project.
Important tasks for the month are organising fundraising for the rent and taking the next steps in improving accessibility; starting with a ramp, a rented moveable toilet, checking the specific grants and making a reconstruction plan.
Current accessibility:
There is a step before the garden gate and then 5 steps leading to the main entrance, each 17 cm high, door widths in the building vary between 50 cm (upstairs washroom door) and 80 cm (entrance door).
The bathrooms are so far only on the upper floor and in the basement. The door to the meeting room is 75 cm wide (as most other doors in the building). There is no bathroom on the ground floor.
Both washrooms in the building are gender neutral.
Problems at work? Come by for (free) advice! ¿Problemas en su laburo? ¡Consejos gratis! Problèmes au travail? Conseils gratuits! Проблеми на роботі? Отримайте безкоштовну пораду!
calendar
A meeting to discuss and plan the next actions of Extinction Rebellion in Iceland and reflect on the previous one.
Accessibility:
“We will make sure to have people there ready to help anybody get where they need to go if they need help.”
There is a step before the garden gate and then 5 steps leading to the main entrance, each 17 cm high, door widths in the building vary between 50 cm (upstairs washroom door) and 80 cm (entrance door).
The bathrooms are so far only on the upper floor and in the basement. The door to the meeting room is 75 cm wide (as most other doors in the building). There is no bathroom on the ground floor.
Both washrooms in the building are gender neutral. The event takes place upstairs.
An independent event organised by Extinction Rebellion Iceland.
Climate Crises Talk – Aviation, transport and whats needed to stay under 1.5°C of warming? // Loftslagskrísuspjall – Flugumferð, samgöngur og hvað þarf til að halda jörðinni undir 1,5°C hlýnun?
Michal Czepkiewicz and Áróra Árnadóttir will give a talk based on their studies into greenhouse gas emissions and climate change – particularly how it relates to aviation and other means of transport.
Accessibility:
“We’ll make sure there will be someone there ready to help anybody who might need help getting around the house or anything else.”
There is a step before the garden gate and then 5 steps leading to the main entrance, each 17 cm high, door widths in the building vary between 50 cm (upstairs washroom door) and 80 cm (entrance door).
The bathrooms are so far only on the upper floor and in the basement. The door to the meeting room is 75 cm wide (as most other doors in the building). There is no bathroom on the ground floor.
Both washrooms in the building are gender neutral.
General Assembly of the Industrial Workers of the World (IWW) Ísland.
Allsherjarfundur Heimssamband Verkafólks á Íslandi
Accessibility:
There is a step before the garden gate and then 5 steps leading to the main entrance, each 17 cm high, door widths in the building vary between 50 cm (upstairs washroom door) and 80 cm (entrance door).
The bathrooms are so far only on the upper floor and in the basement. The door to the meeting room is 75 cm wide (as most other doors in the building). There is no bathroom on the ground floor.
Both washrooms in the building are gender neutral.
Extinction Rebellion in Iceland meeting.
Accessibility:
“We will make sure to have people there ready to help anybody get where they need to go if they need help.”
There is a step before the garden gate and then 5 steps leading to the main entrance, each 17 cm high, door widths in the building vary between 50 cm (upstairs washroom door) and 80 cm (entrance door).
The bathrooms are so far only on the upper floor and in the basement. The door to the meeting room is 75 cm wide (as most other doors in the building). There is no bathroom on the ground floor.
Both washrooms in the building are gender neutral. The event takes place upstairs.
Extinction Rebellion in Iceland meeting.
Accessibility:
“We will make sure to have people there ready to help anybody get where they need to go if they need help.”
There is a step before the garden gate and then 5 steps leading to the main entrance, each 17 cm high, door widths in the building vary between 50 cm (upstairs washroom door) and 80 cm (entrance door).
The bathrooms are so far only on the upper floor and in the basement. The door to the meeting room is 75 cm wide (as most other doors in the building). There is no bathroom on the ground floor.
Both washrooms in the building are gender neutral. The event takes place upstairs.
Closed organisational meeting – Reykjavík Cultural Cypher project
Extinction Rebellion in Iceland meeting.
Accessibility:
“We will make sure to have people there ready to help anybody get where they need to go if they need help.”
There is a step before the garden gate and then 5 steps leading to the main entrance, each 17 cm high, door widths in the building vary between 50 cm (upstairs washroom door) and 80 cm (entrance door).
The bathrooms are so far only on the upper floor and in the basement. The door to the meeting room is 75 cm wide (as most other doors in the building). There is no bathroom on the ground floor.
Both washrooms in the building are gender neutral. The event takes place upstairs.
everyone who is interested in helping with hátíðni is welcome to come to the meeting
Accessibility:
Andrými is unfortunately so far not wheelchair-accessible. There is a step before the garden gate and then 5 steps leading to the main entrance, each 17 cm high, door widths in the building vary between 50 cm (upstairs washroom door) and 80 cm (entrance door).
The bathrooms are so far only on the upper floor and in the basement. The door to the meeting room is 75 cm wide (as most other doors in the building). The meeting takes place upstairs.
Both washrooms in the building are gender neutral.
Meeting of the housing group or anyone interested in joining the accessibility project.
Important tasks for the month are organising fundraising for the rent and taking the next steps in improving accessibility; starting with a ramp, a rented moveable toilet, checking the specific grants and making a reconstruction plan.
Current accessibility:
There is a step before the garden gate and then 5 steps leading to the main entrance, each 17 cm high, door widths in the building vary between 50 cm (upstairs washroom door) and 80 cm (entrance door).
The bathrooms are so far only on the upper floor and in the basement. The door to the meeting room is 75 cm wide (as most other doors in the building). There is no bathroom on the ground floor.
Both washrooms in the building are gender neutral.
Meeting of the housing group or anyone interested in joining the accessibility project.
Important tasks for the month are organising fundraising for the rent and taking the next steps in improving accessibility; starting with a ramp, a rented moveable toilet, checking the specific grants and making a reconstruction plan.
Current accessibility:
There is a step before the garden gate and then 5 steps leading to the main entrance, each 17 cm high, door widths in the building vary between 50 cm (upstairs washroom door) and 80 cm (entrance door).
The bathrooms are so far only on the upper floor and in the basement. The door to the meeting room is 75 cm wide (as most other doors in the building). There is no bathroom on the ground floor.
Both washrooms in the building are gender neutral.
News